The green accents set against the white concrete make these terrazzo façade units stand out!
Produced for the Östra Hospital* project in Gothenburg, they mark our very first production using the new Terrazzo polishing machine - and the results speak for themselves. With grinding up to GRIT 800, the surface achieves a glossy, refined finish, revealing the full depth and texture of the material.
For this project, our scope covers design, production, and installation of both framework and façade elements. This includes three-layer wall units from terrazzo concrete – all crafted to meet the architect’s vision down to the smallest detail.
General contractor: K21 Entreprenad AB
* Östra Hospital, Building 4240, Delivery and Neonatal (FoN) Stage 2