In Saldus Municipality, we are constructing a solar power plant, and UPB Nams is taking care of:
- the construction of the “Baltazar” substation with a total capacity of 110/20 kV;
- the installation of cable connections, including inverters, transformers, and switchgear;
- the construction of a BESS (Battery Energy Storage System) park consisting of 26 battery containers and 13 MVPS units.
The total capacity of the BESS park will be 46 MW / 105.89 MWh, with a total area of 7,740 m².