We saw it firsthand, and yet the scale of this duplex stainless steel bridge is still hard to fully capture. This milestone was made possible by the expertise of our team.
The 45-metre-long, 19-metre-wide, and 240-ton structure was transported to Härnösand, Sweden fully assembled - huge credit to our logistics team who turned this complex transport operation into a smooth execution.
Designed as a rotating bridge, it will allow ships and yachts to pass through, supporting both maritime traffic and urban connectivity. Once operational, it will play a key role in linking two parts of the city and strengthening local infrastructure.

Harnosand bridge
-
Type
-
Year
-
Country
-
CityHärnösand
-
Expertise
-
General contractorPeab

Contact us
