home    site map    UPB AS PRESENTATION / 2017
   
   about us      structure      news      products / projects      social projects      vacancies      photogallery      contacts  
 
    

LV

EN

RU

DE
 
 
 
HOLDING NEWSLETTER PDF
  DOWNLOAD LATEST PDF
  ARCHIVE
  PRODUCT'S CATALOGUES
 
 
COMPANY NEWS
 
   
 
   
 
   
 
|10. 08. 2016| UPB Annual Report 2015 

   
  ALL NEWS
   
 
    Print      Send  
 
 

  

| 17. 10. 2013 | UPB Energy commences a new production course – production of pressure equipment.

The company UPB Energy has successfully commenced a new production course – production of pressure equipment. The first domestic production of a hydraulic separator has been installed in the key project of UPB – SIA ‘Liepājas enerģija’ biomass boiler plant. For the project of two 15 MW wood chip boilers, a hydraulic separator was produced in the factory, the basic functions of which are pressure balancing and protection of the hydraulic system of the boiler plant from impacts in the external heat supply network. 

    

The item has been produced and certified in accordance with the requirements of the Pressure Equipment Directive 97/23/EC of the European Union. The hydraulic separator of UPB Energy corresponds to the highest – IV category of this directive.


During the production, all trials and tests stated in the directive have been carried out, including radiography, magnetic particle testing, ultrasonic testing.    

The hydraulic separator has been successfully certified and operates in Liepaja, Kaiju Street 33A.


Parameters of the hydraulic separator:
Dimensions                   1324x1397x5491
Capacity                         3 m3
Operating pressure       16 bar
Test pressure                24 bar
Operating temperature  120 °C

 
 
 
 
         back
 
 
 
       UPB © 2007 Copyrights | Contacts
Site design and programming by | CIMO |